+387 (0)33 610 600 info@igt.ba

IGT-DVGW TEHNIČKA REGULATIVA ZA GASNI SEKTOR U ZEMLJAMA JUGOISTOČNE EVROPE

T  E  H  N  I  C  A  L    R  U  L  E  S,      updated 06.05.2019. godine
  • Poslovnik za certificiranje osoba kao autoriziranih eksperata u gasnoj struci
  • G 100 (2017) – Qualification Requirements for Experts for Energy Systems  in the Gas Infrastructure
  • G 102 (2014)
  • G 103 (2017) – Requirements for Qualification of competent Person for Maintenance of High Pressure Gas Pipelines; Training Plan
  • G 105 (2019) – Training Plan for the theoretical Education of qualified Persons for CNGFilling Stations and Gas Filling Equipment
  • G 110 (2008)
  • G 213 (2015)
  • G 260 (2014)
  • G 262 (2013)
  • G 263 (2013)
  • G 264 (2012)
  • G 265-2 (2013)
  • G 267 (2017) – Oxygen Content in High Pressure Grids
  • G 280-1 (2013)
  • G 280-2 (2005)
  • G 280-3 (2013)
  • G 281 (2004)
  • G 285 (2008)
  • G 402 (2012)
  • G 403 (2015)
  • G 410 (2019) – Registration of Asset Inventory and Incident Data of Gas Infrastructures
  • G 411 (2019) – Investigation of Incidents on Gas Pipelines and Gas Stations
  • G 412 (2012)
  • G 414 (2011)
  • G 415 (2019) – Design, Construction and Operation of Biogas Pipework with an Operating Pressure up to and including 5 bar
  • G 433 (2013) – Above ground gas storage vessels of public gas supply with an operation pressure greater than 1 bar; Construction and oparation
  • G 434 (2005)
  • G 435 (2010)
  • G 440 (2013)
  • G 441 (2019) – Shut-off Valves for Maximum Operating Pressures up to 100 bar for Gas Infrastructure
  • G 442 (2017) – Potentially explosive Atmosphere at Exhaust Openings of Venting Lines at Gas Plants or Systems
  • G 450 (2017)
  • G 451 (2015)
  • G 452 (2015)
  • G 453 (2017) – Measures regarding incomplete technical Approval Documentation forSteel Pipework for an Operating Pressure greater than 5 bar
  • G 457 (2013)
  • G 458 (2019) – Subsequent Increase of Operating Pressure of Gas Pipelinesmade of Steel
  • G 459-1 (2004) – Gas service pipes for operating pressures up to 4 bar; design and construction
  • G 459-1-B (2008)
  • G 459-2 (2017) – Gas Pressure Regulating Installations with a Maximum Upstream Operating Pressure of 5 bar and a Maximum Design Flow Rate of 200 m³/h under normal Conditions on Service Lines; Functional Requirements
  • G 459-3 (2011) – Cost minimizing potential in the field of service line technologie
  • G 462 (2004)
  • G 463 (2017) – High Pressure Gas Steel Pipelines for a Design Pressure of more than 16 bar; Construction
  • G 465-1 (2004) – Inspekion of gas pipeline systms with an operating pressure up to 4 bar
  • G 465-2 (2005)
  • G 465-3 (2004) – Classification criteria for leaks in buried and not buried pipework in gas distribution systems
  • G 465-4 (2004) – Gas leak detection and gas concentration measuring devices for leakage survey on gas supply systems
  • G 465-4-B1 (2011)
  • G 466-1 (2013)
  • G468-1 (2005)
  • G 468-2 (2011) – Leak Detection specialist – training programme
  • G 469 (2012)
  • G 472 (2005) – Polyethylen gas pipelines with an operating pressure up to and including 10 bar (PE 80, PE 100 ind PE-Xa) – Construction
  • G 473 (2005) – Methods for detection, valuation, treatment and avoidance of bumps on high pressure pipelines
  • G 474 (2011)
  • G 478 (2010) – Rehabilitation of gas pipe lines by textile fibre lining – requirements, quality control and testing
  • G 479 (2019) – Desugn, Construction and Operation of Gas Systems in Areas susceptible to flooding
  • G 481 (2008) – Use of non metallic sealing materials in gas supply and gas utilization
  • G 485 (2011) – Digital interface for gas metering device (DSfG)
  • G 485-B1 (2012)
  • G 486 (2010) – Gas law deviation facztors and natural gas compressibility factors – Calculation and application
  • G 486-B2 (2010)
  • G 487 (2011)
  • G 488 (2014) – Gas guality measurement stations – Design, Construction, Operation
  • G 491 (2011)
  • G 492 (2005)
  • G 493-1 (2013)
  • G 493-2 (2009)
  • G 494 (2007) – Sound proofing of devices and stations for pressure regulation and flow measurement
  • G 495 (2017) – Gas Plants and Systems – Operation and Maintenance
  • G 496 (2011)
  • G 497 (2008)
  • G 498 (2011)
  • G 499 (2017) – Pre-heating of Natural Gas in Gas Plants and Systems
  • G 501 (2015)
  • G 600 (2011) – Technical specifications for gas installations
  • G 609 (2010) – Installation of gas appliances in natural gas vehicles
  • G 613 (2006)
  • G 614-1 (2017) – Above Ground Gas Pipework on Premises behind Point of Delivery; Planning, Installation, Testing and Commissioning
  • G 614-2 (2017) – Above Ground Gas Pipework on Premises behind Point of Delivery;Operation and Maintenance
  • G 615 (2007)
  • G 616 (2012)
  • G 617 (2009)
  • G 618 (2010)
  • G 620 (2010)
  • G 621 (2011)
  • G 622 (2004) – Type Testing of Gas Appliances on the Location of Installation
  • G 623 (2005)
  • G 624 (2011)
  • G 625 (2012)
  • G 626 (2007)
  • G 631 (2013)
  • G 634 (2004) – Installation of catering gas appliances in premises
  • G 635 (2004) – Gas appliances for connection to a system admitting fresh air and discharging products of combustion while operating under positive pressure (standardized procedure)
  • G 636 (2004) – Gas appliances for connection to a system admitting fresh air and discharging products of combustion while operating under draught draw (standardized procedure)
  • G 637-1 (2007)
  • G 638-1 (2005)
  • G 638-2 (2012) – Heating Installations with Overhead Radiant Tube Heaters
  • G 640-1 (2019) – Installation of fully packaged combined Head and Power (CHP) Units
  • G 640-2 (2019) – Installation of fully packaged Fuel Cell Gas Heat Appliances
  • G 641 (2015)
  • G 648 (2012)
  • G 651/VdTÜV M 510 (2012)
  • G 652 (2013)
  • G 656 (2019) – Natural Gas Fuelling Stations; Operation and Maintenance
  • G 660 (2007)
  • G 665 (2011)
  • G 666 (2004)
  • G 670 (2005) – Gas fired heaters and machanical ventilation devices
  • G 674 (2006)
  • G 675 (2006)
  • G 676 (2004)
  • G 676-B1 (2013)
  • G 677 (2007)
  • G 680 (2013)
  • G 685 (2013) – Gas charging
  • G 686 (2014)
  • G 687 (2011)
  • G 689 (2011)
  • G 690 (2010)
  • G 691 (2010) – Measurements of emissions at gas-fired installations for domestic and non-domestic purposes
  • G 692 (2019)
  • G 693 (2014)
  • G 695 (2017) – Quality Control of Adaptation Measures for Gas Appliances
  • G 1000 (2007)
  • G 1001 (2017) – Security of Gas Supply; Risk Management of Gas Infrastructures under Operational Conditions
  • G 1002 (2017) – Security in Gas Supply; Organisation and Management in Crisis
  • G 1010 (2008)
  • G 1020 (2011)
  • G 2000 (2019) – Minimum Requirements with Respect to Interoperability and Connect to Gas Supply Networks
  • G 5120 (2013)
  • G 5305-2 (2015)
  • G 5405 (2014)
  • G 5406 (2019) – Elastomer Materials for Seals and Diaphragms for Gas Supply and Gas Utilization; Requrements, Testing and Identification
  • G 5416 (2012)
  • G 5484 (2017)
  • G 5501 (2015)
  • G 5600-1 (2019)
  • G 5600-2 (2019) – Material Transition Fittings for Polyethylene Pipework made from Plastics;Requirements and Tests
  • G 5614 (2015)
  • G 5616 (2014)
  • G 5616-B1 (2017) – Supplement G 5616; Additional Connection
  • G 5628 (2019) – Installation Systems for Gas Installation inside Buildings, consisting of Multi-Layer Pipes and their corresponding Fittings, for an OperatingPressure less than or equal to 100 mbar; Requirements and Testing
  • G 5634 (2014)
  • G 5702 (2015)
  • G 5902 (2015)
  • G 5952 (2015)

 

  • GW 2 (2013)
  • GW 4 (2014)
  • GW 7 (2015)
  • GW 9 (2013)
  • GW 10 (2011)
  • GW 11 (2017)
  • GW 12 (2013)
  • GW 14 (2006)
  • GW 15 (2015)
  • GW 16 (2012)
  • GW 18 (2014)
  • GW 19-1 (2017) – Determination of Condition Information of non cathodically protected metallic Pipelines of Gas and Water Supply;  Part 1: Detection, Assessment and Recommendations
  • GW 19-2 (2019) – Condition Assessment of non cathodically protected metallic Pipelines of Gas and Water Supply; Part 2: Systematic Review
  • GW 20 (2017)
  • GW 21 (2017)
  • GW 22 (2017)
  • GW 24 (2015)
  • GW 27 (2015)
  • GW 28 (2015)
  • GW 100 (2010)
  • GW 101 (2015)
  • GW 116 (2013)
  • GW 117 (2011)
  • GW 118 (2019) – Provision of Information on Gas and Water Infrastructure)
  • GW 119 (2011)
  • GW 120 (2013)
  • GW 121 (2019) – Long Distance Pipelines and Distribution Grids; Service Items for Surveying Works
  • GW 122 (2010)
  • GW 123 (2010) – Performance charts for the drawing up and continuation of digital mapping
  • GW 125 (2015)
  • GW 126 (2019) – Procceedings about Establishment and Continuation of official Geoinformation
  • GW 127 (2010) – Updating of the digital basic map
  • GW 128 (2009) – Simple surveying on gas and water pipe networks; training plan
  • GW 129 (2013)
  • GW 130 (2019) – Quality Assurance in Network Documentation
  • GW 133 (2010)
  • GW 134 (2014)
  • GW 301 (2013)
  • GW 302 (2009)
  • GW 303-1 (2009)
  • GW 303-2 (2013)
  • GW 304 (2011)
  • GW 306 (2015)
  • GW 308 (2009) – Mobile auxiliary power generators on pipeline site – additional equipment and operational procedures
  • GW 309 (2019) – Electric Bypass for Pipe Cutting
  • GW 310 (2010)
  • GW 312 (2010)
  • GW 315 (2005)
  • GW 316 (2005)
  • GW 320-1 (2011)
  • GW 320-2 (2011) – Rehabilitation of gas and water pipe lines by PE-relining without grouting annular space; requirements, quality assurance and testing
  • GW 321 (2010)
  • GW 322-1 (2007)
  • GW 323 (2011)
  • GW 326 (2019) – Mechanical Joining of PE Pipes in Gas and Water Distribution (Networks) – Competent Person and Supervisor – Requirements and Qualification
  • GW 329 (2010)
  • GW 330 (2006) – Welding of pipes and pipe-line components made of polyethylen (PE 80, PE 100 and PE-Xa) for gas; teaching and testing instructions
  • GW 331 (2006) – PE- Welding supervisor; teaching and testing instructions
  • GW 332 (2005)
  • GW 335-A2 (2007)
  • GW 335-A3 (2007)
  • GW 335-B2 (2007)
  • GW 336-1 (2014)
  • GW 336-2 (2014)
  • GW 340 (2007) – Fiber concrete coating for the mechanical protection of steel pipes and fittings with polyolefine coating
  • GW 350 (2017) – Welding Joints of Steel Pipelines for Gas and Water Supply; Manufacturing, Testing and Evaluation
  • GW 381 (2017) – Building Companies for Underground Line Construction – Minimum Requirements (identical with AGFW FW 600 and VDE-AR-N 4220)
  • GW 392 (2017) – Seamless Copper Tubes and Seamless Copper Tubes With internal Tin Plating for Gas and Drinking Water Installations; Requirements and Tests 
  • GW 541 (2014)
  • GW 1200 (2004)

 

  • VP 113 (2012) – Systems of gas appliances and flue gas piping
  • VP 118 (2012) – Certification of radiant tube heater units
  • VP 121 (2013)
  • VP 200 (2007)
  • VP 305-1 (2010)
  • VP 305-2 (2009)
  • VP 400 (2015)
  • VP 401 (2010) – Seals with higher thermal resistance for unions and flanges in connection with meters and pressure regulators
  • VP 501 (2013)
  • VP 600 (2008) – Metallic fittings for jointing materials for PE
  • VP 601 (2009)
  • VP 601-B1 (2015)
  • VP 614 (2007) – Permanent tube connections for metallic gas pipelines; pressed joints
  • VP 616 (2012)
  • VP 618-1 (2007)
  • VP 625 (2013) – Joints and jointings for inner gas pipes consisting of multilayer composite tubes according to DVGW-VP 632 – requirements and testing
  • VP 625-B1 (2013)
  • VP 626 (2013)
  • VP 632 (2013) – Multilayer composite tubes made of plastics/aluminium/plastic for drinking water and gas installations; gas inside piping with operation pressure 100 mbar
  • VP 634 (2013) – Safety-plugs for gas installations
  • VP 635-1 (2013) – Safety gas connection valves for metallic and/or nonmetallic gaspipes for the connection of flexible metallic or nonmetallic nose assemblies
  • VP 635-2 (2013) – Safety flexible hose assemblies from metallic or nonmetallic materials for safety gas connection valves according to DVGW-VP 635-1
  • VP 702 (2013)

 

  • Gas/Voda Informacija br. 17 (2013)
  • DVGW-Cert Vodić za GW 301 (2013)
  • Informacija Gas br. 10 (2017)
  • Gas Informacija br. 15 (2014)
  • Gas Informacija br. 17 (2015)
  • Gas Informacija br. 20 (2017)